Skip to content

initial commit

initial commit #4

Triggered via push July 23, 2023 11:27
Status Failure
Total duration 23s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 24.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.