Skip to content

Add pre-commit configuration. Link to it via gh action #18

Add pre-commit configuration. Link to it via gh action

Add pre-commit configuration. Link to it via gh action #18

Triggered via push October 22, 2023 14:01
Status Failure
Total duration 1m 27s
Artifacts
Matrix: Run Unit Tests
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Run Unit Tests (ubuntu-latest, nightly)
Process completed with exit code 1.
Run Unit Tests (ubuntu-latest, beta)
Process completed with exit code 1.
Run Unit Tests (macos-latest, stable)
The job was canceled because "ubuntu-latest_beta" failed.
Run Unit Tests (ubuntu-latest, stable)
Process completed with exit code 1.
Run Unit Tests (windows-latest, nightly)
The job was canceled because "ubuntu-latest_beta" failed.
Run Unit Tests (windows-latest, nightly)
The operation was canceled.
Run Unit Tests (ubuntu-latest, 1.70.0)
The operation was canceled.
Run Unit Tests (macos-latest, beta)
The operation was canceled.
Run Unit Tests (macos-latest, 1.70.0)
The job was canceled because "ubuntu-latest_beta" failed.
Run Unit Tests (macos-latest, 1.70.0)
The operation was canceled.
Run Unit Tests (windows-latest, stable)
The operation was canceled.
Run Unit Tests (windows-latest, beta)
The operation was canceled.
Run Unit Tests (windows-latest, 1.70.0)
The operation was canceled.
Run Unit Tests (macos-latest, nightly)
The operation was canceled.