Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

OCPBUGS-42510: Include fix for CVE-2024-47211 #592

Open
wants to merge 1 commit into
base: master
Choose a base branch
from

Conversation

elfosardo
Copy link

No description provided.

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Oct 7, 2024
@openshift-ci-robot
Copy link

@elfosardo: This pull request references Jira Issue OCPBUGS-42510, which is valid. The bug has been moved to the POST state.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.18.0) matches configured target version for branch (4.18.0)
  • bug is in the state New, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @jadhaj

The bug has been updated to refer to the pull request using the external bug tracker.

In response to this:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot openshift-ci-robot added the jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. label Oct 7, 2024
Copy link

openshift-ci bot commented Oct 7, 2024

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: elfosardo

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Oct 7, 2024
@elfosardo
Copy link
Author

/test prevalidation-e2e-metal-ipi-ovn-ipv6-prevalidation

1 similar comment
@elfosardo
Copy link
Author

/test prevalidation-e2e-metal-ipi-ovn-ipv6-prevalidation

Copy link

openshift-ci bot commented Oct 8, 2024

@elfosardo: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/e2e-metal-ipi-bm 2673b0a link true /test e2e-metal-ipi-bm
ci/prow/e2e-metal-ipi-virtualmedia 2673b0a link true /test e2e-metal-ipi-virtualmedia
ci/prow/e2e-metal-ipi-ovn-ipv6 2673b0a link true /test e2e-metal-ipi-ovn-ipv6
ci/prow/images 2673b0a link true /test images

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@elfosardo
Copy link
Author

/test prevalidation-e2e-metal-ipi-ovn-ipv6-prevalidation

@iurygregory
Copy link

/lgtm

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Oct 9, 2024
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

3 participants